Waterproof cloth construction method

Sep 20, 2021

The base surface of the waterproof construction should be solid, flat, smooth, and free from looseness, sanding, cracks, warping and sharp protrusions, potholes, hollowing, etc. Before construction, the surface must be smooth, firm, and clean, so that the construction process will be easier, and the waterproof step function is also good.


1. Generally, if the material is selected according to the regulations, some water will be added to the material appropriately, but when you need to pay attention, the water must be added to the liquid material first, and then stirred. After stirring, it is fine as long as it does not contain particles. Do not stir by hand. After coating, you can add some colorful pigments to form a colorful waterproof layer.


2. During construction, you must choose appropriate tools for operation, from the low part to the bottom to the middle to the top.


3. For the protection of the protective layer, it must be carried out about three days after the completion of the waterproof layer. In order to be able to proceed quickly, we can paint on the last side and sprinkle with clean medium-coarse sand, and it is basically complete. .


Send Inquiry